Wave-compensating Drilling Rig


With the increasing of demand for refined offshore investigation and surveying and especially marine CPT service, the market demand for marine wave-compensating drilling rigs increases tremendously. Qingdao Binhai Investigation and Surveying Co., Ltd. (abbr. as “QBIS” or “The company” hereafter)  summarized nearly 30 years of experience in offshore drilling exploration, referred to advanced domestic and foreign technologies, and organized a backbone team to develop and manufacture a new type of modular wave-compensating drilling rig (Operational capability of offshore drilling: water depth + borehole depth can reach 600 m) as well as a new type of customized wave-compensating drilling rig (Operational capability of offshore CPT: water depth + borehole depth can reach 300 m).

The wave-compensating drilling rig system includes derrick, elevation and feeding system, elevation compensating system, power head, clamping and unclamping device, winch system, driller house and its supporting facilities, hydraulic power station system, mud pumps and its supporting facilities, mud tank system, and so on. The supporting system for CPT operation includes submarine baseplate and its elevation system, moon pool cover and its transfer system, and CPT drill rods and drill bits.

The drilling rig is characteristic of drilling downward with a power head, and compared with the traditional drilling rigs, it has the advantages as follows:

Good convenience in transportation and installation;

High safety in offshore operation;

High coring rate and accurate data;

Strong resistance against wind and waves and hence a high operation rate;

Wide adaptability and applicability in various marine geological investigation projects related to offshore wind power, marine geology, bridge, wharf and tunnel, etc.

So far, they have been applied to a number of professional exploration ships, and made outstanding contributions to the successful completion of relevant investigation projects, and hence widely recognized and praised by different investigation units and owner units.



Binhai 66 Drilling Ship HYZ-500 Wave-compensating Drilling Rig


组 1.jpg


After the HYZ-500 wave-compensating drilling rig was installed on the Binhai 66 Drilling Ship, main achievements accomplished so far are listed as follows:

S/N

Project name

Water depth (m)

Borehole depth (m)

Work quantity of ordinary drilling exploration (m)

Work quantity of CPT (m)

1

Supercharging platform of Huanhai Company

23

120

/

120

2

Engineering investigation of offshore wind power base (BW Site) in the north of Shandong Peninsula, China Huaneng Group Co., Ltd. 

16 ~ 20

80

570

160

3

Engineering geological investigation of comprehensive utilization adjustment project of clean energy (Phase I) in Penglai Oilfield

28 ~ 30

80

335

320

4

Investigation of offshore wind power project at U Site south of Shandong Peninsula (Section 1 and Section 3),  State Power Investment Corporation Limited (SPIC) 

17 ~ 32

65

/

4500

5

Marine investigation of offshore wind power project at U and V Site in the south of Shandong Peninsula  (preliminary investigation stage), State Power Investment Corporation Limited (SPIC) 

17 ~ 32

60 ~ 80

1003

498

6

Marine investigation of offshore wind power project at V Site in the south of Shandong Peninsula  (construction drawing investigation stage), State Power Investment Corporation Limited (SPIC)

17 ~ 32

60 ~ 80

500

806.96

7

Marine investigation of  No. 3 and No. 4 offshore wind power project in the south of Shandong Peninsula, State Power Investment Corporation Limited (SPIC)

28 ~ 33

70 ~ 90

3000

/

8

Investigation of offshore wind power A Site project in the middle of Bohai Sea, Shandong Energy Group

13 ~ 15

100

600

/

...

...



...

...

Cumulative work quantities (m)



10000 +

10000 +

 

As an indispensable and important equipment of Binhai 66 Drilling Ship, HYZ-500 wave-compensating drilling rig has exhibited excellent performance and unique advantages in accomplishing various projects. Its highly-efficient working mode has greatly improved the execution efficiency of the projects, effectively shortened their construction period, and hence achieved considerable advantages in time and cost for the company. Its wide range of application enables it to operate stably under various geological conditions, effectively reducing risks and uncertainties. In actual operation, its wave compensation technology makes the drilling process more stable, greatly improves the quality of drilling exploration and the accuracy of data acquisition, and contributes significantly to the smooth progress and successful accomplishment of the projects.



Binhai 67 Drilling Ship HYZ-500D67 Wave-compensating Drilling Rig


组 2.jpg


After the HYZ-500D67 wave-compensating drilling rig was installed on the Binhai 67 Drilling Ship, main achievements accomplished so far are listed as follows:

 

S/N

Project name

Water 

depth

(m)

Borehole depth

(m)

Work quantity of ordinary 

drilling exploration (m)

Work quantity

of CPT

 (m)

1

Fanshiyi offshore wind power project in  Yangjiang City, China General Nuclear Power Corporation (CGNPC)

45 ~ 50

90

/

2340

2

Liuao offshore wind power project (Phase II) in Zhangpu County of Zhangzhou City

41 ~ 45

100

/

401

3

BDB6# (300MW) offshore wind power project (Phase I) in Muping District of Yantai City, China Three Gorges Corporation

32 ~ 35

85

425

/

4

400MW offshore photovoltaic power project in HG30 Block, China General Nuclear Power Corporation (CGNPC)

10 ~ 15

10 ~ 50

2400

/

5

Engineering investigation of Offshore Wind Power Base (BW Site) in the north of Shandong Peninsula, China Huaneng Group Co., Ltd.

16 ~ 20

80

570

160

6

Engineering geological investigation of comprehensive utilization adjustment project of clean energy (Phase I) in Penglai Oilfield

28 ~ 30

80

335

320

7

Preliminary engineering investigation of Offshore Wind Power Base ( N-1 Site) of Shandong Peninsula, China Huaneng Group Co., Ltd.

60 ~ 61

90

/

540

...

...



...

...

Cumulative work quantities (m)



4000 +

4000 +

 

As an extremely-powerful tool of Binhai 67 Drilling Ship, HYZ-500D67 wave-compensating drilling rig has exhibited tremendously-high efficiency in accomplishing complex drilling tasks in a relatively short period of time, and hence provided strong support for the progress of the investigation projects. Its wide range of application enables it to operate stably under various geological conditions, effectively reducing risks and uncertainties. In actual operation, its wave compensation technology makes the drilling process more stable, greatly improves the quality of drilling exploration and the accuracy of data acquisition, and contributes significantly to the smooth progress and successful accomplishment of the projects.

 

As an indispensable and important equipment of Binhai 67 Drilling Ship, HYZ-500D67 wave-compensating drilling rig has exhibited excellent performance and unique advantages in accomplishing various projects. Its highly-efficient working mode has greatly improved the execution efficiency of the projects, effectively shortened their construction period, and hence achieved considerable advantages in time and cost for the company. Its wide range of application makes it not only perform well in conventional drilling work, but also show strong adaptability and stability in complex environment and special geological conditions, so much so that it has provided a strong guarantee for the successful implementation of all kinds of projects.



No.17 Marine Geological Investigation Ship  HYZ-500YT Wave-compensating Drilling Rig


72a9424b-626d-4b4d-b24e-917e966d2a06.jpg


The drilling rig, which is being installed and commissioned on the ship, will have a profound impact on the industry and propel it to a new development height. We firmly believe that through continuous innovation and technological breakthrough, this advanced rig technology will bring revolutionary changes to the industry, which will definitely introduce a strong impetus into the fields of geological survey and new energy exploration, and create a more brilliant perspective.



A Scientific Research Ship  BH-600 Wave-compensating Drilling Rig


未标题-1.jpg


 This drilling rig is still under intensive research and development. Its construction will inject new vitality into the investigation industry. Its advanced technology and efficient performance will greatly improve the efficiency and safety of drilling operations, so as to promote the entire industry towards a more modern and sustainable future. Let us look forward to its birth, and hope that it will bring us a beautiful and bright prospect.

联系我们

  • 0532-55662612
  • qdbhkc@163.com
  • 青岛市市北区连云港路33号万达商务B栋

官网手机端

企业客服

微信公众号

Copyright © 2020-2023 青岛滨海勘察测绘有限公司 版权所有 备案号:鲁ICP备16012853号-1

技术支持: 微动力网络